Sr. No. | Name of lines | Total Ckm. | Ckm. Planned during 2009-10 |
| A | 400KV TRANSMISSION LINES | | |
| 1 | 400KV Kosamba - Choraniya line | 470.0 | 70.0 |
| 2 | 400KV LILO at Kosamba from Asoj - Ukai line | 64.0 | 64.0 |
| 3 | 400KV Mundra - Varsana line | 166.0 | 166.0 |
| 4 | 400KV Varsana - Hadala line | 300.0 | 300.0 |
| 5 | 400KV Mundra - Zerda line | 662.0 | 62.0 |
| 6 | 400KV Vadinar - Hadala line | 232.0 | 232.0 |
| | TOTAL : 400 KV Line | | 894.0 |
| B | 220KV TRANSMISSION LINES | | |
| 1 | 220KV Utran - Kosamba line | 172.0 | 86.0 |
| 2 | 220KV LILO at Kosamba from Vav - Zagadia line | 10.2 | 10.2 |
| 3 | 220KV LILO at Sikka from Jamnagar - Jetpur line | 234.0 | 34.0 |
| 4 | 220KV Viramgam - Salejada (Dholka) line | 124.0 | 100.0 |
| 5 | 220KV LILO at Bhat from Viramgam - Salejada line | 68.8 | 68.8 |
| 6 | 220KV LILO at Lakhani from Zerda - Tharad line | 1.0 | 1.0 |
| 7 | 220KV LILO at Botad from 220KV Kasor - Vartej line | 38.7 | 38.7 |
| 8 | 220KV Mangrol - Mobha line | 218.0 | 164.6 |
| 9 | 220KV Mundra - Varsana line | 166.0 | 141.0 |
| 10 | 220KV Varsana - Morbi line | 214.0 | 214.0 |
| 11 | 220KV Hazira (GSEC) - Kosamba line | 124.0 | 62.0 |
| 12 | 220KV Hazira (GSEC) - Mota line | 111.0 | 55.5 |
| 13 | 220KV Pipavav (GPPC) - Dhokadva line | 98.6 | 49.3 |
| 14 | 220KV LILO at Pipavav from Savarkundla - Otha line | 185.3 | 92.6 |
| 15 | LILO of 2nd ckt. of 220KV Wanakbori - Ranasan at Kapadwanj | 30.0 | 30.0 |
| 16 | LILO of 2nd circuit of 220 KV Dhrangadhra – Morbi at Halvad | 4.0 | 4.0 |
| 17 | 220KV Sankhari - Jangral line | 60.0 | 30.0 |
| 18 | LILO of 220KV D/C Halvad-Morbi at 400KV Bhimasar (PGCIL) s/s | 215.0 | 75.0 |
| 210.0 | 70.0 |
| 19 | 220KV Tharad - Deodar line | 77.5 | 12.0 |
| 20 | 220KV Tharad - Thavar (Dhanera) line | 97.1 | 15.3 |
| 21 | 220KV Nakhatrana - Varsana line | 190.0 | 60.0 |
| 22 | 220KV Kheralu - Bhutia (Mathsur) line | 98.8 | 15.0 |
| 23 | 220KV LILO at Kukma from Varsana - Nani Khakhar line | 34.0 | 34.0 |
| | TOTAL : 220 KV Line | | 1463.0 |
| C | 132KV TRANSMISSION LINES | | |
| 1 | 132KV Godhra - Dahod line | | 53.0 |
| | TOTAL : 132 KV Line | | 53.0 |
| D | 66KV TRANSMISSION LINES | | |
| 1 | 66KV lines for new Sub Stations | | 700 |
| | TOTAL : 66 KV Line | | 700 |
| | TOTAL : 400 KV, 220 KV, 132KV, 66 KV Lines (A+B+C+D) | | 3110.0 |